A Glasgow bathroom is very often the smallest room in a flat with the most services running through it, and half of every renovation here is decided by where the soil stack is. Get that right and a small bathroom can feel generous. Ignore it and you spend the budget on drainage instead of on the finish.

Bathroom with quadrant shower enclosure and wall-hung WC
Completed bathroom renovation in Glasgow

What actually happens, in order

The old suite comes out along with the tiling and usually the floor. Then first fix: pipework and cabling into the walls for the new positions, which is the point at which the layout stops being changeable. Then walls and floor are made good, wet wall or tiling goes on, the suite is installed, and the last day is silicone, sealing and the small stuff nobody thinks about until it is missing.

The reason it is worth spelling out is that most of the disruption sits in the first two days and most of the visible progress sits in the last two. The middle of a bathroom job always looks like nothing is happening.

Tenement floors and the things underneath them

Traditional Glasgow flats have timber floors, and lifting a bathroom floor regularly turns up old lead or iron pipework, previous alterations done badly, or joists that have been notched further than they should have been. We would rather find that on day one with the floor up than have it appear as a leak into the flat below six months later.

Wet wall or tiles

Wet wall panelling is quicker, has no grout to discolour and suits a small room where the walls are not perfectly true. Tiling gives you more choice and a better result in a larger bathroom with sound, flat walls. Neither is the correct answer in general; it depends on the room and the budget, and we will give you a straight recommendation for yours.

Bathroom Renovation in Glasgow: common questions

Can I move the toilet in a tenement bathroom?+

Sometimes, but it is the most expensive thing to move because a WC needs a short run to the stack with enough fall. A basin or even a shower can usually be relocated far more cheaply. If the layout change you want depends on moving the WC, we will price it clearly so you can decide whether it is worth it.

How long will I be without a bathroom?+

Most full renovations run one to two weeks depending on the amount of tiling and whether the plumbing is being altered. If it is your only bathroom we will tell you honestly which days you will be without it rather than leaving you to find out.